Outside temperature is 7 deg.C, temp. in the workshop is 14 deg.C. Epoxy resin warmed up to 20 degr. and using the fast hardener tomorrow for glassing and fairing.
Friday, November 15, 2013
Wednesday, November 13, 2013
Depressions For Rudder Lashing In The Skeg
605 hrs
Still preparing the lower port hull surface for glassing on saturday!
JWD advises to cut 100 x 25 mm depressions, 6 mm deep into the skeg for rudder lashings before glassing. We will to this after glassing and therefore we made a test-sample from 12mm ply + 4 layers of glass and fillercoat. Then we cutted the depressions with a router and a " copydisc". The result you can see on the photos.
Sunday, November 10, 2013
Friday, November 1, 2013
After Two Weeks Sailing In Turkey Back at Project
Creating a New Layout and still making Fillets and Filling the Screwholes. In the next weeks the porthull should be Ready for glassing. Winter is coming in Austria and the Workshop is Not Heated. So the temperature Could be a Problem for working with epoxy. Will See....
Tuesday, October 8, 2013
Friday, October 4, 2013
Thursday, September 26, 2013
Subscribe to:
Posts (Atom)









































